SaskPower has decided to proceed with a 350 megawatt natural gas-fired power station in Moose Jaw. Minister responsible Dustin Duncan says it was still the most cost-effective way to go, even though the carbon tax will be applied to the emissions. The facility is scheduled to be completed in 2024, and will generate enough power for a city the size of Saskatoon.