Manitoba has announced an increase in outflow from the Shellmouth Reservoir.
It’s been increased today (Fri) as part of the normal operation to draw down the level of the dam in preparation for spring runoff from the upper Assiniboine River.
The outflow is being increased from 300 to 500 cubic feet per second.
This will result in about a one-foot level increase from the Shellmouth Reservoir to Russell, and a half-foot or less from Russell to Brandon.










